9.2.2022

What do you need to know when renovating an apartment?

What do you need to know when renovating an apartment?

When all the preparatory work before the start of the repair has been carried out, you can begin to repair and import the necessary equipment for work. Before starting the implementation of the planned repair, it is necessary to adhere to strict rules and sequence of actions. Following them, you can greatly facilitate the process of implementing the planned interior.

Of course, you need to start work with dismantling. It is necessary to get rid of everything superfluous that can interfere with the work and prepare the premises for the implementation of future ideas.The dismantling is completed, the space of the room is ready for the construction of partitions and replacement of windows. The first step is to build new partitions. The materials from which the walls are built can be completely diverse: aerated concrete blocks, ordinary or moisture-resistant drywall, brick, etc.Wiring of communications, engineering networks. Which includes electrical works, works on water supply and heating, installation of ventilation and air conditioning systems.

Ceiling. After the hidden networks are carried out, the electrical wiring is in place, you can proceed with the installation of the ceiling. The most practical variation is plasterboard ceilings. Other ceiling designs are possible, for example, stretched and leveled with plaster, but a plasterboard ceiling has a number of advantages, such as: the ability to hide engineering communications inside the structure, introduce interesting built-in lighting systems, the ability to level any initially curved ceiling, the ability to apply sound insulation.After all the necessary communications have been made in the walls, and the ceiling has been successfully installed, you can proceed to the next stage of finishing - rough painting. This stage includes plastering and rough painting work, leveling the plane of the walls, drawing corners. You can not bypass doorways and slopes.Screed device. Before pouring the floor, there are a few things to consider. In wet rooms it is necessary to make waterproofing with a small plant on the walls. And in rooms where a warm floor is provided - place it according to the markings in the design project. The screed itself can be of different types - dry, wet, cement-sand, etc. – it is better to choose the types of screed based on its drying properties, floor characteristics, floor thickness and budgetWhen the walls in the bathrooms are prepared, all communications are made and revision hatches are outlined, you can proceed with the layout and installation of tiles. Tiles are first laid on the walls, and then on the floor, although there are exceptions.Fine finishing materials. After all the rough work with the walls and ceiling is done properly, you can start finishing. But, if the interior has classic plaster decor elements, stucco moldings, moldings and rosettes, they need to be installed at this stage.

Fine finishing works include painting, wallpaper, decorative plastering. Often, floor coverings are laid after one coat of paint, and then fixed with a second coat of paint. But many combine both layers of painting in one stage.The floor is ready for finishing when the screed is completely dry. Depending on the type of finish, they use technologies that are different in time and complexity of the process.Interior doors. After the final work related to the fine finish, you can proceed to the installation of doors and the design of doorways. In the case of flush-mounted doors (the inner case of which was installed in advance, after the screed device), it is only necessary to install the curtains.In the case of swing doors with architraves, both components are installed in one period. With sliding doors, variations may be different. Either mechanisms with rollers are installed after fine finishing work (in this case, the guide will be visible), or it is necessary to think over the design of the hidden canister in advance at the stage of rough work. It is better to investigate the exact information about the doors at the design project development stage.

Installation of plumbing and external parts of mechanisms. All the dirty work associated with the repair is finished. You can breathe a sigh of relief! It remains to connect the plumbing, or rather its external parts, since all the hidden elements have already been installed.Also at this stage, the external parts of sockets and switches are mounted, as well as various temperature controllers, multimedia devices and control units of the Smart Home system are connected. And you can safely hang the external parts of the air conditioning system.Now the hardest part is over! All draft and finishing stages of repair are completed! This is followed by the most pleasant and creative part of the repair - the installation of joinery, the placement of furniture and the addition of pleasant little things - decor in the interior.